If you require a different configuration of modules than what are available below, please contact us.
Templates
Update History:
August 2023
Service Ducts on all templates have been made more visible (changed to Green fills instead of Grey boxes).
All modules and halls have been optimised to reduce the file sizes by up to 25%.
July 2023
All templates have been updated to be more consistent.
The Auditorium has been updated to the latest plan:
One row of service ducts has moved.
The door storage has increased in size.
The Keep Clear Areas have changed and increased in size.
In general, there is now less saleable space.
January 2022
Contractor Entrances have been marked on the Boulevard.
March 2021
The North Lorryway has been added to the 'All North & South Modules plus Capital Hall and Auditorium' template.
August 2020
Panel locations have been added between N23 and Capital hall, and S23 and Auditorium. These are to help with the positioning of the staircases if those are to be used.
May 2020
Service Duct Numbers have been added.
Various Food/Drink Outlet names have been updated.
Exclusion Zones updated in the Boulevard.
Module N16 (Entrance N8), Exclusion Zone for sliding door updated just inside entrance going along front wall and slightly into N17.
Formula E Track added.
Exclusion Zone in S8/S9 extended to cover electrical supply box for sliding doors.
28th Feb 2019
Lorry Door S2 has been updated to make it wider as per updates supplied by the venue.
29th Jan 2019
Entrance Arrow and Text added to Capital Hall. Affects all templates containing the Capital Hall.
24th Jan 2019
The Screentrack hatching for N12-N13 was on an incorrect layer. Affects all templates containing N12 and N13.
21st Jan 2019
Seating outside entrances N10 and S9 have been put on their own layers. Affects all templates containing the Boulevard.
9th Jan 2019
Additional Exclusion Zones added to Boulevard. Affects all templates containing the Boulevard.